1246382 HOSE AS Caterpillar parts 24H, 836G, 836H HOSE
Rating:
Alternative (cross code) number:
CA1246382
124-6382
1246382
CA1246382
124-6382
1246382
Buy HOSE AS 1246382 Caterpillar genuine, new aftermarket tractor parts with delivery
LANDFILL COMPACTOR, MOTOR GRADER,
Information:
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A(1) 9U-6198 Crankshaft Turning Tool 1
A(2) 9U-7336 Housing 1
5P-7305 Engine Turning Tool 1
B 230-6284 Timing Pin (Camshaft) 1
C 136-4632 Timing Pin (Crankshaft) 1
268-1966 Adapter 1
(1) The Crankshaft Turning Tool is used on the front pulley.
(2) This Tool is used in the aperture for the electric starting motor.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g06327243
If necessary, use Tooling (A) to ensure that number one piston is at top dead center on the compression stroke. Refer to Testing and Adjusting, "Finding Top Center Position for No.1 Piston". for the correct procedure.
Ensure that Tooling (C) is installed in hole (Y) in the cylinder block. Use Tooling (C) to lock the crankshaft in the correct position.Note: Do not use excessive force to install Tooling (C). Do not use Tooling (C) to hold the crankshaft during repairs.
Illustration 2 g06327245
Ensure that Tooling (C) is installed into hole (X) in gear (1).
Illustration 3 g06327249
Clean idler gear (8) and inspect idler gear (8) for wear or damage. Refer to Specifications, "Gear Group (Front)" for more information. If necessary, replace idler gear (8).
Clean hub (14) and inspect hub (14) for wear or damage. Refer to Specifications, "Gear Group (Front)" for more information. If necessary, replace hub (14).
Illustration 4 g06327106
Lubricate hub (14) with clean engine oil. Install hub (14) into idler gear (8). Ensure that the timing marks are toward the front of the idler gear.
Illustration 5 g06327255
Illustration 6 g06327092
Align the timing mark on idler gear (8) with the timing mark on camshaft gear (1) and engine oil pump gear (2). Install the assembly of idler gear (8) and hub (14) into the recess in the timing case. Ensure that oil Hole (Z) is to the top of the hub.Note: The idler gear must be tilted during installation. Ensure that the holes in the hub are aligned with the holes in the cylinder block.
Clean plate (12) and inspect the plate for wear or damage. If necessary, replace plate (12).
Lubricate plate (12) with clean engine oil. Align the holes in plate (12) with the holes in the hub. Install plate (12) in the original orientation.
Install bolts (13).
Remove Tooling (B) and Tooling (C).Note: Ensure that timing marks are aligned, before removing Tooling (B) and Tooling (C).
Tighten bolts (13) to a torque of 44 N m (32 lb ft).
Use Tooling (D) to measure the end play of camshaft gear (1). Refer to Specifications, "Gear Group (Front)" for more information.
Use Tooling (D) to measure the backlash between idler gear (8) and camshaft gear (1). Refer to Specifications, "Gear Group (Front)" for more information.
Use Tooling (D) to measure the backlash between idler gear (8) and the crankshaft gear. Refer to Specifications, "Gear Group (Front)" for more information.
Illustration 7 g06327258
Install a new O-ring seal (3) to plug (4). Install plug (4) to the cylinder block. Tighten plug (4) to a torque of 21 N m (186 lb in).
Lubricate the teeth of the gears with clean engine oil.End
Table 1
Required Tools
Tool Part Number Part Description Qty
A(1) 9U-6198 Crankshaft Turning Tool 1
A(2) 9U-7336 Housing 1
5P-7305 Engine Turning Tool 1
B 230-6284 Timing Pin (Camshaft) 1
C 136-4632 Timing Pin (Crankshaft) 1
268-1966 Adapter 1
(1) The Crankshaft Turning Tool is used on the front pulley.
(2) This Tool is used in the aperture for the electric starting motor.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g06327243
If necessary, use Tooling (A) to ensure that number one piston is at top dead center on the compression stroke. Refer to Testing and Adjusting, "Finding Top Center Position for No.1 Piston". for the correct procedure.
Ensure that Tooling (C) is installed in hole (Y) in the cylinder block. Use Tooling (C) to lock the crankshaft in the correct position.Note: Do not use excessive force to install Tooling (C). Do not use Tooling (C) to hold the crankshaft during repairs.
Illustration 2 g06327245
Ensure that Tooling (C) is installed into hole (X) in gear (1).
Illustration 3 g06327249
Clean idler gear (8) and inspect idler gear (8) for wear or damage. Refer to Specifications, "Gear Group (Front)" for more information. If necessary, replace idler gear (8).
Clean hub (14) and inspect hub (14) for wear or damage. Refer to Specifications, "Gear Group (Front)" for more information. If necessary, replace hub (14).
Illustration 4 g06327106
Lubricate hub (14) with clean engine oil. Install hub (14) into idler gear (8). Ensure that the timing marks are toward the front of the idler gear.
Illustration 5 g06327255
Illustration 6 g06327092
Align the timing mark on idler gear (8) with the timing mark on camshaft gear (1) and engine oil pump gear (2). Install the assembly of idler gear (8) and hub (14) into the recess in the timing case. Ensure that oil Hole (Z) is to the top of the hub.Note: The idler gear must be tilted during installation. Ensure that the holes in the hub are aligned with the holes in the cylinder block.
Clean plate (12) and inspect the plate for wear or damage. If necessary, replace plate (12).
Lubricate plate (12) with clean engine oil. Align the holes in plate (12) with the holes in the hub. Install plate (12) in the original orientation.
Install bolts (13).
Remove Tooling (B) and Tooling (C).Note: Ensure that timing marks are aligned, before removing Tooling (B) and Tooling (C).
Tighten bolts (13) to a torque of 44 N m (32 lb ft).
Use Tooling (D) to measure the end play of camshaft gear (1). Refer to Specifications, "Gear Group (Front)" for more information.
Use Tooling (D) to measure the backlash between idler gear (8) and camshaft gear (1). Refer to Specifications, "Gear Group (Front)" for more information.
Use Tooling (D) to measure the backlash between idler gear (8) and the crankshaft gear. Refer to Specifications, "Gear Group (Front)" for more information.
Illustration 7 g06327258
Install a new O-ring seal (3) to plug (4). Install plug (4) to the cylinder block. Tighten plug (4) to a torque of 21 N m (186 lb in).
Lubricate the teeth of the gears with clean engine oil.End
Caterpillar parts catalog:
Parts hose Caterpillar catalog:
2423560
HOSE AS
834G, 836G
834G, 836G
2221980
HOSE AS
824K, 825K, 834G, 834H, 834K, 836G, 836H, 836K
824K, 825K, 834G, 834H, 834K, 836G, 836H, 836K
2510855
HOSE AS
824G II, 824H
824G II, 824H
1977596
HOSE AS
824C, 824G II, 824H, 825G II, 825H
824C, 824G II, 824H, 825G II, 825H
1977595
HOSE AS
824G II, 824H, 825G II, 825H
824G II, 824H, 825G II, 825H
2019673
HOSE AS
824G II, 825G II
824G II, 825G II
2435338
HOSE AS
834G
834G
2253035
HOSE AS
834G, 834H
834G, 834H
2313450
HOSE AS
836G, 836H
836G, 836H
2971448
HOSE AS
836G, 836H
836G, 836H
2971449
HOSE AS
836G, 836H
836G, 836H
2309106
HOSE AS
836G
836G